AccountGuest Edition My Account My Che.com Log In
Article
Email Email Print Print
Clip Clip & File

Only on Che.com :: Latest News

March 5, 2014

ThyssenKrupp Industrial Solutions to build turnkey cement plant in Algeria

Gerald Ondrey

ThyssenKrupp Industrial Solutions (Essen, Germany; www.thyssenkrupp-industrial-solutions.com), the ThyssenKrupp Group’s plant engineering specialist, has received an order to build a cement clinker production line in Algeria. The customer is Société des Ciments de Ain El Kebira (SCAEK), a subsidiary of Algerian cement manufacturer Groupe Industriel des Ciments d’Algérie (GICA). The value of the contract is in the mid three-digit million euro range. The new 6,000-ton/d cement clinker plant will be built in Ain El Kebira, around 300 km east of Algiers near the provincial capital Setif. Start-up is planned for 2016.

Hans Christoph Atzpodien, CEO of ThyssenKrupp Industrial Solutions says: “The order validates our strategy of combining technological expertise with a strong presence in the world’s growth regions. We profit from infrastructure expansion in the emerging markets and, with our engineering expertise, help serve rising global demand for capital goods, energy and raw materials in a resource-friendly way.”

The order includes the supply of key components for operations including raw-material processing, clinker manufacture and cement loading, the installation of a laboratory automation system for quality assurance and monitoring, and the turnkey handover of the plant to the customer.

The key components are a 2,000-ton/h crusher for limestone and marl, a 500-ton/h crusher for aggregates, and a 50,000-ton capacity circular blending bed. Raw materials will be ground in two Polysius Quadropol QMR2 roller mills (throughput 350 ton/h), and a 30,000-ton homogenizing silo will be used to store raw meal.

The kiln line comprises a five-stage, two-string Prepol AS preheater, a 5.2 x 78 meter rotary kiln, and a Polysius Polytrack cooler with intermediate crusher. Cement grinding will be carried out in three ball mills with high-efficiency SEPOL separators (5 x 14.5 meters, 6,000 kW central drive). Four storage silos each with a capacity of 20,000 tons of cement, four packaging lines, and six automatic and two manual loaders round out the plant. The Polysius Polab laboratory automation system will be installed for quality monitoring and control.

 

 

 

Add a Comment

Name:
Email:
Comments:

Please enter the letters or numbers you see in the image. (refresh)
 
 

Related Stories

LinkedIn Groups

Our LinkedIn group is now over 28,000 members strong!

  1. Join other CPI professionals from all over the globe and share best practices, expertise, concerns and more.
  2. Provide feedback to Chemical Engineering Editors


Current members represent Worley Parsons, DuPont, SABIC, Fluor, Air Products, LyondellBasell, Nalco, Dow Chemical, Dow Corning, BASF, Jacobs Engineering, ExxonMobil, Shell, Chevron and more.

Join Now



We also offer the following subgroup for more targeted discussions:

Tools
Search the Buyers' Guide

Plant Cost Index

Facts at Your Fingertips (archive)

Ask the Experts

Back Issues
X
To access this area, please log in or create an account.
Username:
Password:
Forgot your password?
Request it now.
Processing...
Live chat by BoldChat