Crow’s nest
| By Chemical Engineering
The fact that I was 150 ft up, on the outside of an extraction column, in January, in Canada, in a 20-mph wind, was not the worst part of the experience. The worst part was that the column was not working properly, and I had helped to design it.
Like…