I D
× COMMENTARYCOVER STORYIN THE NEWSNEWSFRONTSCHEMENTATOR + Show More
Chemical Engineering MagazineChementator Briefs
Sulfur control Preferential Oxidation Catalysis — a new catalytic solution…
BUSINESS NEWS
Chemical Engineering MagazineBusiness News
Plant Watch Perstorp will construct new plant for sodium formate…
TECHNICAL & PRACTICALFEATURE REPORTFACTS AT YOUR FINGERTIPSTECHNOLOGY PROFILEEQUIPMENT & SERVICESFOCUSNEW PRODUCTS + Show More SHOW PREVIEWS

Comment Business & Economics

First Integrated Solutions opens new facility in Dundee, U.K.

By Scott Jenkins |

First Integrated Solutions Ltd. (Aberdeen, U.K.; firstintegrated.co.uk), a global provider of rental equipment solutions to the to the utilities, chemical, energy, engineering and transport sectors, announced the opening of their new facility based within the port of Dundee, U.K.

First Integrated Solutions can now deliver equipment packages for projects for both local and global clients from the office as well as grow its presence in the area. The new location allows the company to work more closely and efficiently with their Dundee-based clients, to deliver a composite service solution which includes the supply of lifting equipment, ATEX equipment, welding equipment, blasting & painting equipment, hydraulic equipment, inspection services, wire rope sling manufacture and consumable supplies for offshore and onshore developments.

 

Related Content

Chemical Engineering publishes FREE eletters that bring our original content to our readers in an easily accessible email format about once a week.
Subscribe Now
Quadruple Sensor Lifetime with a Retractable Housing
Minimizing Explosion Risk Where Other Solutions Cannot
Minimizing Corrosion with Fast, Robust Gas Analysis
Lower Measurement Point Costs with Automatic pH Sensor Cleaning
Reduce the Risk of Corrosion in Fertilizer Production

View More

Live chat by BoldChat