Mobile Navigation

Member Exclusive

Five Steps to Replacing Aged Heat-Transfer Fluid

Changing out used heat-transfer fluid is critical to the efficiency of a heat-transfer fluid system. A well-operated heat-transfer-fluid system can enable efficient production, fewer shut-downs, less maintenance time and lower costs. In order to maintain a sound heat-transfer system, it…

Corrosion in Flexible Burner Hoses

Piping leakage due to corrosion has the potential to cause catastrophic fires and damage to process equipment in petroleum refining and other chemical process industries (CPI) facilities. When such incidents occur, a large amount of damage and a long downtime…

Member Exclusive

Ruptured rupture disc

It was Terry Thurber’s idea. It was a bad idea. But Bob Miller and Nick Urbanski taught me many years ago that, in the research and development (R&D) world, bad ideas are often the best ideas. Install things upside down…

Member Exclusive

Bechtel acquires Chevron’s water treatment process and more business news

Plant Watch KBR to provide technology package for ammonia/urea plant in Indonesia February 7, 2013 — KBR (Houston; www.kbr.com) has announced that it was selected by PT Pupuk Sriwidjaja Palembang, to provide licensing, engineering services and proprietary equipment for a…

Thermowell Installation

Temperature is among the most critical measurements in the chemical process industries (CPI) for operating safe and efficient processes. Because even a small error in temperature can lead to expensive consequences, accurate and reliable monitoring of temperature is required. Thermowells…

Steam-System Water Preparation

Supplying steam that meets process needs while protecting steam-system components, such as boilers and steam turbines (Figure 1), against scale, fouling and corrosion, requires purified feedwater (condensate plus makeup water). Depending on the steam pressure required, the specific approach of…

Member Exclusive

Accelerating Process and Product Development

These simple strategies can be used to speed up and increase the success rates of R&D projects Research and development (R&D) projects usually require significant time, effort and manpower to become successful. Despite the significant resources spent on R&D projects,…

Member Exclusive

Lonza to Expand ADC Manufacturing Capacity and More Business News

Plant Watch Lonza to expand ADC manufacturing capacity January 8,2013 —Lonza (Basel, Switzerland; www.lonza.com) plans to invest 14 million Swiss francs (CHF; about $15 million) to expand antibody drug conjugate (ADC) manufacturing capacity in Visp, Switzerland. Oncology therapeutics including ADCs…

Member Exclusive

Sizing, Specifying and Selecting Centrifugal Pumps

Determining the proper preliminary size for centrifugal pumps during the initial stages of any pump-specification exercise requires numerous calculations and assumptions. This article reviews the steps needed to size centrifugal pumps during the early stages of a project, to support…

Environmental Permitting Barriers for Dryers and Kilns

 Figure 1. A handful of ceramic proppants is shown here Carbo Ceramics This article covers permitting and directly related design issues associated with thermal processes using drying and calcining for the production of both proppant sand and ceramic proppants (Figure…